1.A Case Study
The goal of this case study is to use the Power Plant's ECS (coding system) to find the valve RCV 332 VP. You will be presented with an internal code. From this code you will need to figure out which plant the action needs to take place and the part that needs to be replaced.
Power Plant Coding System
1A Case Study
2The theory of ECS